Europan 10, 1st Prize - Implementation

During the second phase of the design, a workshop in Trondheim took place with the participation of Trondheim municipality, Svartlamon community as well as specialized construction engineers. We had the opportunity to adjust the scheme according to the involved groups real needs and demands. The project should be based on innovative construction methods and sustainability building strategies.It was decided that the building will be made of massive wood using recycled/reconstituted materials and black/grey water recycling systems.

Collaborator:Point Supreme Architects, Beth Hughes
Location: Svartlamon, Trondheim, Norway

Previous
Previous

Europan 10 1st Prize

Next
Next

Pharmacy in Athens